Expo City - KSA Pavilion

Project/ Client Name
Expo City - KSA Pavilion
Product Deployed: POWERTEK
Project Overview
As part of its commitment to sustainability and smart infrastructure, Expo City – KSA Pavilion partnered with HITEK AI to implement the POWERTEK platform. This initiative focused on real-time energy monitoring, infrastructure visibility, and data-driven utility management to optimize power consumption across the pavilion.

Infrastructure Monitored
- Electricity Distribution Boards:
- 4 Main Distribution Boards (MDBs)
- 14 Sub Main Distribution Boards (SMDBs)
- 14 DBs/PMUs for circuit-level monitoring
- 5 for Lighting
- 11 for Power Loads
- Photovoltaic (PV) System:
- 1 PV MDB
- 1 PV SMDB (via same SMDB data point)
- Total Data Points Captured: 50
Results & Benefits
- ✅ Granular Energy Visibility: POWERTEK enabled real-time data acquisition from critical distribution points, allowing for improved load balancing and consumption insights.
- ✅ Optimized Power Distribution: Lighting and power circuits were individually monitored, enabling proactive fault detection and energy usage analysis.
- ✅ Smart Infrastructure Readiness: The integration of PV monitoring provided visibility into renewable energy usage and solar contribution across operational loads.
Impact Summary
The deployment of POWERTEK at the Expo City – KSA Pavilion laid the foundation for energy transparency, performance tracking, and long-term sustainability. It also positioned the Pavilion as a model for data-driven energy management in cultural and event-based infrastructure.
Ready to Transform Your Business with AI-Powered Smart Solutions?
Experience how HITEK AI can optimize your building efficiency, cut operational costs, and accelerate your sustainability goals - all through intelligent automation and real-time insights.